title image

OUR WORK

909-790-5222 OPEN: MON-FRI 7:30 AM - 4:30 PM

OUR WORK

RECENT PROJECTS

  • All
  • EDUCATIONAL
  • HEALTHCARE
  • INSTITUTIONAL
  • COMMERCIAL
  • HOSPITALITY
  • HEAVY CIVIL
La Habra High School
Completion: 2019 Owner: FJUHSD Construction Manager: AMG & Associates Architect: Ruhnau Clarke Scope: This project consisted of a new 24,981 sq ft, Performing Arts Center which houses a large theater...+
Pacifica High School
Completion: 2020 Owner: Garden Grove Unified School District CM: Neff Construction Architect: Westgroup Designs Scope: This project included 9 new buildings and a complete update to the site’s underground infrastructure.+
MLK Behavioral Health
Completion: 2019 Owner: County of LA DPW CM: IDR Architect: Perkins Eastman Scope: Plumbing+
San Vicente Breast Center
Completion: 2019 Owner: Cedar-Sinai Medical Center CM: Layton Construction Contractors, Inc. Architect: Cannon Design Scope: This project consisted of a 3 story satellite building...+
El Camino High School
Completion: 2020 Owner: El Camino CCD CM: Tilden-Coil Constructors Architect: HMC Architects Scope: This project consists of a new 2 story natatorium and classroom building...+
West Hollywood Park
Completion: 2020 Owner: City of West Hollywood CM: Sinanian Development Architect: LPA, Inc Scope: This project consists of a new 5 story and 3 story building...+
Castaic High School
Completion: 2018 Owner: William S. Hart UHSD CM: Neff Construction Architect: Ruhnau Clarke Architects Scope: This project included 11 new buildings and 8 athletic areas...+
Claremont High School Student Center
Completion: 2020 Owner: Claremont USD CM: Horizons Construction Company Architect: WLC Architects Scope: A new 2 story Student Service Building containing...+
Produce LA
Completion: 2019 Owner: Michael Siemering CM: Pankow Architect: Ehrlich Yanai Rhee Chaney Architects Scope: Installation of off-site utilities including a new sewer line, manhole, and storm drain curb-o-lets...+
Rancho Los Amigos – Support Services
Completion: 2019 Owner: LA Public Works Construction Manager: Kemp Bros Architect: Taylor Design Scope: A broad range of plumbing systems...+
Indio Middle School
Completion: 2020 Owner: Desert Sands USD Construction Manager: Ledesma & Meyer Architect: WLC Architects Scope: All aspects of plumbing within the 8 buildings...+
Savanna High School
Completion: 2020 Owner: Anaheim Union High School Construction Manager: Erickson Hall Construction  Architect: Dougherty & Dougherty Architects Scope: Connections and completion of storm drain...+
Banning Downtown Water Main
Completion: 2011 Owner: City of Banning  Scope: Reroute and replace domestic water main through downtown Banning+
Wheelock Gym
Riverside, CA Completion: 2012 Owner: Riverside Community College District Construction Manager: Tilden-Coil Constructors Architect: gkkworks +
SAN JUAN CAPISTRANO – EASTERN WELLSWATER PIPELINE
Install a new pipeline in the City of San Juan Capistrano. Fusible PVC low profile fused joint. 16", 18" and 20" DR18.  +
Rialto Elementary School
Completion: 2010 Owner: Rialto Unified School District  CM:  Ledesma & Meyer Construction Company, Inc. Architect: NTD Architecture SCOPE: Plumbing, Offsite & Onsite Utilities+
Crafton Hills College Learning Resource Center
Completion: 2011 Owner: San Bernardino Community College District CM: Tilden-Coil Constructors  Architect: Steinberg Architects Scope: Plumbing+
Banning Police Station
Completion: 2009  CM: Oakview Constructors Inc. Architect: Holt Architects Scope: Plumbing, Site Utilities, and Wet Piping +
Redlands University Center for the Arts
Completion: 2009 Owner: University of Redlands General Contractor: Tilden-Coil Constructors Architect: Loescher Meachem Architects Inc.+
HAWTHORNE ELEMENTARY SCHOOL
Completion: 2008 Owner: Riverside Unified School District Construction Manager: Neff Construction, Inc. Architect:  LPA, Inc.  Scope Plumbing and underground utilities +
COLTON HIGH SCHOOL
Completion: 2005 Owner: Colton Joint Unified School District   Construction Manager: Ledesma & Meyer Construction Company, Inc. Architect:  Fields Devereaux Architects Scope: Complete plumbing modernization on water, sewer, and fixtures...+
RCC STUDENT SERVICES
Completion: 2016 Owner: Riverside Community College District  Construction Manager: Bernards Architect: HMC Architects Scope: Site Utilities: New sewer, water and storm drain.+
OLD ORCHARD ELEMENTARY
380′ sewer, 36′ water, 220′ fire water, 850′ gas, 2220′ storm drain, 1000 sq. ft. Ecorain Tank...+
UCR ENVIRONMENTAL HEALTH & SAFETY
Completion: 2014-2016 Owner: UC Riverside Contractor: PCL Construction SCOPE: Site Utilities: New sewer, water, fire, gas...+
VA LOMA LINDA
Completion: 2016 Contractor: Burr-MZT SCOPE: Design and relocate the Sterile Processing Facility at the Loma Linda Medical Center to the third floor adjacent to surgery (OR). +
NEWCOMB ACADEMY K-8
Completion: 2015 Construction Manager: Pinner Construction SCOPE: Utilities Onsite- Underground Sewer, Water, Storm Drain,+
CALICO GHOST TOWN OHV HOOKUPS
Construction of a new 68 space campground including; sewer, water, irrigation, grading, concrete and electrical...+
CRAFTON HILLS COLLEGE NEW SCIENCE BLDG.
Completion: 2015 Contractor: West-Tech Mechanical SCOPE: Mechanical Piping for the new science building...+
CSU Colins College
CSU Collins College
Completion: 2015 Construction Manager: Gilbane Building Co SCOPE: Site Utilities: 1200 LF of 10″ water main connecting two existing campus main lines...+
UCIMC CDDC Expansion
Completion: 2015-2017 Contractor: 2H Construction SCOPE: All domestic plumbing and medical gas piping...+

AREAS WE SERVE