Aldi
About This Project

ALDI Distribution Center

Moreno Valley, CA

Contractor: Graycor Construction

Completion: 2015

Scope

The project required over 5,000 of building sewer with a depth ranging from 20 ft deep at the low end to 8 ft deep at the high end. Our underground crews manage this scope. Also included was high end building plumbing for the 2 story office, break room, truckers restrooms, pump rooms and cast iron roof drains up to 16″. Trimble was used to locate all plumbing pipes capped flush for tilt-up panels.