Completion: 2014
Owner: San Gorgonio Pass Water Agency
Architect: Albert A Webb Associates
This project consisted of creating 5 large recharge basins including 24” piping which connected each basin. The project required the processing of 430,000 cubic yards of native material to shape the basins to life. The basins will be filled with California Aqueduct water that flows through 11,200lf of 24” piping Pro-Craft installed in a previous phase.