title image

OUR WORK

909-790-5222 OPEN: MON-FRI 7:30 AM - 4:30 PM

OUR WORK

RECENT PROJECTS

  • All
  • EDUCATIONAL
  • HEALTHCARE
  • INSTITUTIONAL
  • COMMERCIAL
  • HOSPITALITY
  • HEAVY CIVIL
Savanna High School
Completion: 2020 Owner: Anaheim Union High School Construction Manager: Erickson Hall Construction  Architect: Dougherty & Dougherty Architects Scope: Connections and completion of storm drain...+
Banning Downtown Water Main Improvements
Completion: 2011 Owner: City of Banning  Scope Reroute and replace domestic water main through downtown Banning+
Wheelock Gym Seismic Retrofit
Riverside, CA Completion: 2012 Owner: Riverside Community College District Construction Manager: Tilton-Coil Constructors Architect: gkkworks  +
San Juan Capistrano – Eastern WellsWater Pipeline
Install a new pipeline in the City of San Juan Capistrano. Fusible PVC low profile fused joint. 16", 18" and 20" DR18.  +
Rialto Elementary School
Completion: 2010 Owner: Rialto Unified School District  CM:  Ledesma & Meyer Construction Company, Inc. Architect: NTD Architecture Scope Plumbing, Offsite & Onsite Utilities +
Crafton Hills College Learning Resource Center
Completion: 2011 Owner: San Bernardino Community College District CM: Tilden-Coil Constructors  Architect: Steinberg Architects Scope Plumbing+
Banning Police Station
Completion: 2009  GC: Oakview Constructors Inc. Architect: Holt Architects Scope Plumbing, Site Utilities, and Wet Piping +
Indio High School
Completion: 2009 Owner: Desert Sands Unified School District  CM: Ledesma & Meyer Construction Company, Inc Architect: Ruhnau-Ruhnau-Clarke Scope Utility improvements and relocation to server upcoming modernization+
REDLANDS UNIVERSITY CENTER FOR THE ARTS
Completion: 2009 Owner: University of Redlands General Contractor: Tildon-Coil Constructors Architect: Loescher Meachem Architects Inc.+
HAWTHORNE ELEMENTARY SCHOOL
Completion: 2008 Owner: Riverside Unified School District Construction Manager: Neff Construction, Inc. Architect:  LPA, Inc.  Scope Plumbing and underground utilities +
COLTON HIGH SCHOOL MODERNIZATION
Completion: 2005 Owner: Colton Joint Unified School District   Construction Manager: Ledesma & Meyer Construction Company, Inc. Architect:  Fields Devereaux Architects Scope Complete plumbing modernization on water, sewer, and fixtures throughout the campus, including classrooms, gym, and administration offices.   +
RCC STUDENT SERVICES & ADMIN. BLDG.
Completion: 2016 Owner: Riverside Community College District  Managed by: Bernards Designed by: HMC Architects Scope Site Utilities: New sewer, water and storm drain.+
OLD ORCHARD ELEMENTARY
380′ sewer, 36′ water, 220′ fire water, 850′ gas, 2220′ storm drain, 1000 sq. ft. Ecorain Tank...+
UCR ENVIRONMENTAL HEALTH & SAFETY
New sewer, water, fire, gas and storm drain Offsite Utilities; 18″ storm drain in Linden Street...+
VA LOMA LINDA RELOCATE SPD
Design and relocate the Sterile Processing Facility at the Loma Linda Medical Center...+
NEWCOMB ACADEMY K-8
Four sewer connection and two fire services. Complete building plumbing with 250 plumbing fixtures...+
BEAUMONT AVENUE RECHARGE FACILITY
7,400 LF of 24’’ c-900 Raw Water piping to charge retention basins for groundwater replenishment...+
CALICO GHOST TOWN OHV HOOKUPS
Construction of a new 68 space campground including; sewer, water, irrigation, grading, concrete and electrical...+
CRAFTON HILLS COLLEGE NEW SCIENCE BLDG.
Mechanical Piping for the new science building. Scope includes a connection to the campus’ existing facility...+
CSU Colins College
CSU Colins College
1200 LF of 10″ water main connecting two existing campus main lines...+

AREAS WE SERVE