title image

OUR WORK

909-790-5222 OPEN: MON-FRI 7:30 AM - 4:30 PM

OUR WORK

RECENT PROJECTS

  • All
  • EDUCATIONAL
  • HEALTHCARE
  • INSTITUTIONAL
  • COMMERCIAL
  • INDUSTRIAL
  • HEAVY CIVIL
Banning Downtown Water Main Improvements
Completion: 2011 Owner: City of Banning  Scope Reroute and replace domestic water main through downtown Banning+
Wheelock Gym Seismic Retrofit
Riverside, CA Completion: 2012 Owner: Riverside Community College District Construction Manager: Tilton-Coil Constructors Architect: gkkworks  Scope New Plumbing systems for men's and woman's restrooms, locker rooms, and team rooms.+
San Juan Capistrano – Eastern WellsWater Pipeline
Install a new pipeline in the City of San Juan Capistrano. Fusible PVC low profile fused joint. 16", 18" and 20" DR18.  Jack and bore under 5 Fwy and Railway into the pump station. +
Rialto Elementary School
Completion: 2010 Owner: Rialto Unified School District  CM:  Ledesma & Meyer Construction Company, Inc. Architect: NTD Architecture Scope Plumbing, Offsite & Onsite Utilities +
Crafton Hills College Learning Resource Center
Completion: 2011 Owner: San Bernardino Community College District CM: Tilden-Coil Constructors  Architect: Steinberg Architects Scope Plumbing+
Banning Police Station
Completion: 2009  GC: Oakview Constructors Inc. Architect: Holt Architects Scope Plumbing, Site Utilities, and Wet Piping +
Indio High School
Completion: 2009 Owner: Desert Sands Unified School District  CM: Ledesma & Meyer Construction Company, Inc Architect: Ruhnau-Ruhnau-Clarke Scope Utility improvements and relocation to server upcoming modernization+
REDLANDS UNIVERSITY CENTER FOR THE ARTS
Completion: 2009 Owner: University of Redlands General Contractor: Tildon-Coil Constructors Architect: Loescher Meachem Architects Inc. Scope The new 700 seat Center for the Arts consists of fine arts facilities and a new black box theatre. The Center for the Arts was designed and constructed to obtain LEED Gold Certification. The site and offsite utility upgrades were installed throughout an active campus without any disruption or downtime to instruction. New offsite water lines were installed down a busy street with bore and jack requirements under the railway. City streets were upgraded for fire access and roads were extended through project 300 feet, including utility and sidewalk upgrades. Significant coordination was required with all municipalities for offsite approval.+
HAWTHORNE ELEMENTARY SCHOOL
Completion: 2008 Owner: Riverside Unified School District Construction Manager: Neff Construction, Inc. Architect:  LPA, Inc.  Scope Plumbing and underground utilities +
COLTON HIGH SCHOOL MODERNIZATION
Completion: 2005 Owner: Colton Joint Unified School District   Construction Manager: Ledesma & Meyer Construction Company, Inc. Architect:  Fields Devereaux Architects Scope Complete plumbing modernization on water, sewer, and fixtures throughout the campus, including classrooms, gym, and administration offices.   +
RCC STUDENT SERVICES & ADMIN. BLDG.
Completion: 2016 Owner: Riverside Community College District  Managed by: Bernards Designed by: HMC Architects Scope Site Utilities: New sewer, water and storm drain. Offsite Utilities: Relocation of 550lf active and existing 8″ city of Riverside sewer main. Plumbing; Waste, vent, water, gas, condensate, roof drains. This project had a PLA. BIM Coordinated with our in-house design team and Trimble was used for hanger layout.+
OLD ORCHARD ELEMENTARY
380′ sewer, 36′ water, 220′ fire water, 850′ gas, 2220′ storm drain, 1000 sq. ft. Ecorain Tank...+
UCR ENVIRONMENTAL HEALTH & SAFETY
New sewer, water, fire, gas and storm drain Offsite Utilities; 18″ storm drain in Linden Street...+
VA LOMA LINDA RELOCATE SPD
Design and relocate the Sterile Processing Facility at the Loma Linda Medical Center...+
NEWCOMB ACADEMY K-8
Four sewer connection and two fire services. Complete building plumbing with 250 plumbing fixtures...+
BEAUMONT AVENUE RECHARGE FACILITY
7,400 LF of 24’’ c-900 Raw Water piping to charge retention basins for groundwater replenishment...+
CALICO GHOST TOWN OHV HOOKUPS
Construction of a new 68 space campground including; sewer, water, irrigation, grading, concrete and electrical...+
CRAFTON HILLS COLLEGE NEW SCIENCE BLDG.
Mechanical Piping for the new science building. Scope includes a connection to the campus’ existing facility...+
CSU Colins College
CSU Colins College
1200 LF of 10″ water main connecting two existing campus main lines...+
UCIMC CDDC Expansion
Pro-Craft has been awarded the contract by 2H Construction to provide all domestic plumbing and medical gas piping and equipment...+

AREAS WE SERVE