Our Work

A Selection of Pro-Craft Projects

If you have questions about any of these projects or want to discuss your project,
Please call us at (909) 790-5222 or email us at estimating@procraftci.com.

Date

Project Name

Location

Service

Market

Scope

7/20/2020

RLA Recuperative Care & Res. Treatment

Downey

Plumbing

Healthcare

Install new plumbing systems.

7/16/2020

Vineyard JHS Mod Summer 2020 Project

Alta Loma

Plumbing

Education

Installation of underground waste piping to support revised restroom layouts. Exterior fire suppression adjusted to new ceiling heights.

6/3/2020

Olita ES HVAC & Roof Replacement

La Habra

Plumbing

Education

New gas and condensate piping to support installation of new HVAC units. Earthquake valve installed at campus gas meter location.

6/1/2020

UCR SOM Clinical Skills & Simulation Ste

Riverside

Plumbing

Education

Construction of Clinical Skills and Simulation Suite inside of Orbach Science Library renovation.

5/1/2020

Desert Hot Springs HS New CTE Buildings

Desert Hot Springs

Site Utilities and Plumbing

Education

Installation of new site sewer, domestic water, fire and SD retention system. Building plumbing to include underground DWV SD and water. Solar water heating system.

5/1/2020

MSJC Bldg. F & Central Plant

Temecula

Plumbing

Education

Demolition of existing cooling tower, installation of new cooling tower, installation of new electro-mechanical chiller along with associated pumps, piping controls and electrical work.

4/29/2020

Cubberley K-8 HVAC Mod

Long Beach

Site Utilities and Plumbing

Education

Installation of plumbing systems supporting HVAC upgrades. Plumbing for updated restrooms and drinking fountains, including underground DWV, water condensate and gas.

3/9/2020

UCR Parking Structure 13

Riverside

Site Utilities and Plumbing

Education

Parking structure to replace surface lot 13. Installation of site utilities including domestic water, fire, sewer and storm drain. Off-site sewer connections to existing sewer main.

2/1/2020

ARMC Oncology Infusion Clinic

Colton

Plumbing

Healthcare

Installation of building plumbing to support remodel of 2nd floor Oncology CLIR Systems.

12/2/2019

S. Pasadena HS Athletics

South Pasadena

Site Utilities and Plumbing

Education

Construction of field house and remodel of gym and associated site work.

11/18/2019

Glendale HS Aquatic Center

Glendale

Site Utilities and Plumbing

Education

New pool and locker room.

11/11/2019

Stevenson ES HVAC Upgrade

Long Beach

Plumbing

Education

Underground DWV and above ground plumbing to include DWV water condensate and gas piping.

9/23/2019

Produce LA

Los Angeles

Site Utilities

Commercial

Installation of site and off-site utilities.

9/9/2019

Hermosa North School

Hermosa Beach

Site Utilities and Plumbing

Education

Plumbing and site utilities.

8/20/2019

John Muir K-8 HVAC Upgrade

Long Beach

Site Utilities and Plumbing

Education

Plumbing and site utilities.

8/19/2019

MSJC - Temecula Valley Campus

Temecula

Plumbing

Education

Building plumbing.

7/15/2019

Claremont HS Student Center

Claremont

Site Utilities and Plumbing

Education

Site and building plumbing.

7/3/2019

Measure GG @ Jefferson ES

Corona

Site Utilities and Plumbing

Education

Construction of 3 new buildings and Building E.

6/1/2019

Loyola HS - Xavier Hall

Los Angeles

Site Utilities and Plumbing

Education

Demolition of 17,100 SF Assembly Hall and new construction of 33,840 SF Assembly Hall.

< 1  2  3 >

Let’s Discuss Your Project

Let’s Discuss
Your Project