Our Work
A Selection of Pro-Craft Projects
If you have questions about any of these projects or want to discuss your project,
Please call us at (909) 790-5222 or email us at estimating@procraftci.com.
Project Name | Location | Service | Market | Owner | General Contractor | Project Value | Scope |
Vineyard JHS Modification | Alta Loma | Plumbing | Education | Alta Loma USD | N/A | $600K - $700K | Installation of underground waste piping to support revised restroom layouts. Exterior fire suppression adjusted to new ceiling heights. |
Olita ES HVAC & Roof Replacement | La Habra | Plumbing | Education | Lowell JUSD | $50K - $100K | New gas and condensate piping to support installation of new HVAC units. Earthquake valve installed at campus gas meter location. | |
UCR SOM Clinical Skills & Simulation Ste | Riverside | Plumbing | Education | UCR | $300K - $400K | Construction of Clinical Skills and Simulation Suite inside of Orbach Science Library renovation. | |
Desert Hot Springs HS New CTE Buildings | Desert Hot Springs | Site Utilities and Plumbing | Education | Palm Springs USD | $500K - $600K | Installation of new site sewer, domestic water, fire and SD retention system. Building plumbing to include underground DWV SD and water. Solar water heating system. | |
MSJC Bldg. F & Central Plant | Temecula | Plumbing | Education | Mt. San Jacinto CCD | $400K - $500K | Demolition of existing cooling tower, installation of new cooling tower, installation of new electro-mechanical chiller along with associated pumps, piping controls and electrical work. | |
Cubberley K-8 HVAC Mod | Long Beach | Site Utilities and Plumbing | Education | Long Beach USD | $600K - $700K | Installation of plumbing systems supporting HVAC upgrades. Plumbing for updated restrooms and drinking fountains, including underground DWV, water condensate and gas. | |
UCR Parking Structure | Riverside | Site Utilities and Plumbing | Education | UC Riverside | $700K - $800K | Parking structure to replace surface lot 13. Installation of site utilities including domestic water, fire, sewer and storm drain. Off-site sewer connections to existing sewer main. | |
ARMC Oncology Infusion Clinic | Colton | Plumbing | Healthcare | Arrowhead Regional Medical Center | Hamel Contracting, Inc. | $200K - $300K | Installation of building plumbing to support remodel of 2nd floor Oncology CLIR Systems. |
South Pasadena USD Athletics | South Pasadena | Site Utilities and Plumbing | Education | South Pasadena USD | $900K - $1M | Construction of field house and remodel of gym and associated site work. | |
Stevenson ES HVAC Upgrade | Long Beach | Plumbing | Education | Alta Loma SD | $600K - $700K | Underground DWV and above ground plumbing to include DWV water condensate and gas piping. | |
Produce LA | Los Angeles | Site Utilities | Commercial | Michael Siemering | $200K - $300K | Installation of site and off-site utilities. | |
Hermosa North School | Hermosa Beach | Site Utilities and Plumbing | Education | Hermosa Beach City SD | $1M - $2M | Plumbing and site utilities. | |
John Muir K-8 HVAC Upgrade | Long Beach | Site Utilities and Plumbing | Education | Long Beach USD | $500K - $600K | Plumbing and site utilities. | |
MSJC - Temecula Valley Campus | Temecula | Plumbing | Education | Mt. San Jacinto CCD | $3M - $4M | Building plumbing. | |
Claremont HS Student Center | Claremont | Site Utilities and Plumbing | Education | Claremont USD | $700K - $800K | Site and building plumbing. | |
Measure GG @ Jefferson ES | Corona | Site Utilities and Plumbing | Education | Corona- Norco USD | $1M - $2M | Construction of 3 new buildings and Building E. | |
Loyola HS - Xavier Hall | Los Angeles | Site Utilities and Plumbing | Education | Loyola HS of Los Angeles | $1M - $2M | Demolition of 17,100 SF Assembly Hall and new construction of 33,840 SF Assembly Hall. |