Our Work
A Selection of Pro-Craft Projects
If you have questions about any of these projects or want to discuss your project,
Please call us at (909) 790-5222 or email us at estimating@procraftci.com.
Project Name | Location | Service | Market | Owner | General Contractor | Project Value | Scope |
UCR Pierce Hall Improvements | Riverside | Site Utilities | Education | UCR | $200K - $300K | Interior and exterior improvement of Pierce Hall. | |
Banning HS Theater & Career Tech Bldg | Banning | Site Utilities and Plumbing | Education | Banning USD | $1M - $2M | Construction on the PAC & Career Tech buildings and site work. | |
Yorba Linda Library & Art Center | Yorba Linda | Site Utilities and Plumbing | Civic/Institution | City of Yorba Linda | $1M - $2M | Construction of a 2-story library, and 1 story arts center. Includes exterior public spaces, surface parking lot, supportive site improvements and infrastructure. | |
Jordan HS Major Reno Phase 2A | Long Beach | Site Utilities and Plumbing | Education | Long Beach USD | $1M - $2M | Modernization of building. | |
Beverly Hills HS Mod Bldgs. B1 & B2 | Beverly Hills | Site Utilities and Plumbing | Education | Beverly Hills USD | $1M - $2M | Modernization of site utilities and plumbing for two buildings. | |
Patton State Hospital - New Main | Patton | Site Utilities | Healthcare | State of CA Dept. of General Services | $100K - $200K | Construction new central kitchen building including restrooms, locker rooms, conference rooms and break rooms. | |
VA Loma Linda Operating Room | Loma Linda | Plumbing | Healthcare | Dept. of Veteran Affairs | $100K - $200K | Remodel of 3rd floor for new operating room. | |
Castaic HS | Santa Clarita | Site and Plumbing | Education | William S. Hart UHSD | Castaic HS Construction. Inc. | $6M - $8M | New cooling tower, new electro-mechanical chiller with associated pumps/piping controls and electrical; new water quality lab. |
El Camino CC - New Pool/Nat & Classroom | Torrance | Site Utilities and Plumbing | Education | El Camino CCD | $1M - $2M | Installation of new site utilities and plumbing. | |
Larry Smith Correctional Facility - Laundry | Banning | Site Utilities and Plumbing | Civic/ Institution | County of Riverside | $300K - $400K | Installation of site utilities and plumbing for a new laundry facility. | |
CBU College of Engineering | Riverside | Plumbing | Education | Cal Baptist University | Gensler | $900K - $1M | Provide fixtures, hook-ups, and plumbing for 45 classrooms and laboratories. |
CBU Magnolia Student Housing | Riverside | Site Utilities | Education | Cal Baptist University | $1M - $2M | Construction of New Student Apartment Housing and Parking. | |
San Diego CHP Replacement Facility | San Diego | Site Utilities | Municipalities | California DGS | $700K - $800K | Installation of site utilities at new CHP facility. | |
Meadow Green ES | Whittier | Site Utilities and Plumbing | Education | Lowell Joint School District | $600K - $700K | Replaced HVAC system, replace roofing at permanent building & replace sewer system. | |
Marina HS Pool Replacement | Huntington Beach | Site Utilities and Plumbing | Education | Huntington Beach HS District | $200K - $300K | Remove two existing pools and replace with new. All new mechanical equipment yard, pool deck, storm drain connector to all new piping. | |
Mt. Sac Gym Aquatics and Heritage Hall | Walnut | Plumbing | Education | Mt. San Antonio CCD | $3M - $4M | Install plumbing at 3 new buildings Gym, Hall ,and Aquatics. Plumbing from ground up. Install site gas to 3 new buildings. | |
SVUSD Royal HS Portable Relocation | Simi Valley | Site Utilities | Education | Simi Valley USD | $60K - $70K | De-construct, move, and re-install of two modular buildings, relocating from Simi ES to the Rancho Simi Community Park pool. Install site fire lines for portables. |